by Cheryl Archer | Jan 16, 2018 | Commercial Signage, Exterior Signs, Recent Projects
Last Spring we worked with Cahill Contractors, Oakland to fabricate two exterior building signs for two locations in Oakland. Both were made of DiBond and were being used to brand commercial building structures in Oakland. Recently we were contacted by another...
by Cheryl Archer | Dec 20, 2017 | Recent Projects, Vehicle Vinyl Lettering, Vehicle Wraps & Fleet Graphics
We have lost count of how many vehicle decals we have produced for Silman Construction but the last batch of door decals was for 10 pairs for lettering trucks that were being added to the fleet. We have produced several batches of decals for their vehicles as well as...
by Cheryl Archer | Dec 1, 2017 | Exterior Signs, Post and Panel Signs, Recent Projects, Restaurant Signs
When local food supplier, La Terra Fina, had their exterior post and panel sign damaged in a collision they decided that now would be a great time to switch out their exterior signs. The new logo had already been approved so our designer got to work laying out the...
by Cheryl Archer | Nov 24, 2017 | EVAC Maps, Recent Projects, Vnyl Graphics
Our client owns an eight unit apartment complex in downtown Oakland and had been told by the Oakland Fire Department that he needed updated evacuation maps that complied with local fire codes. Initially, he had planned to manage the approval aspects of the project...
by Cheryl Archer | Oct 27, 2017 | Illuminated Signs, Recent Projects
We had worked with the Carl’s Jr. owner in Oakland to replace his sign faces and he referred us to another store in Redwood City whose frontal store sign was old and faded. One true thing about illuminated cabinet signs, – they are highly visible, especially at...
by Cheryl Archer | Oct 26, 2017 | Post and Panel Signs, Recent Projects
We are happy to report that the final phase of the Chef’s Warehouse exterior building signs is now complete. The two post and panel signs, one delineating the visitor entrance and the other helping to direct suppliers to the delivery area, are both in place. We had...