SignWorks recently wrapped up an extensive project for ADART, a company that sought us out for a significant sign removal task. The project involved removing signs from several branches of the former First Republic Bank, which will soon become new branches of JP Morgan Chase. Our hardworking crew spent the past 10 days tackling this challenging job across multiple locations, including the Chinatown and Montgomery branches in San Francisco, as well as branches in El Portal and El Camino. Let’s dive into the details of this massive effort!

The Scope of the Project

Locations Involved

  • San Francisco (Chinatown and Montgomery branches)
  • El Portal
  • El Camino

The Challenges We Faced

Coordinating Multiple Crews

This project was no small feat. We had to coordinate multiple crews to ensure everything was done efficiently and safely. Each location required a different approach and timing, making coordination key to our success.

  • Team Effort: Multiple crews worked simultaneously at different locations.
  • Scheduling: We had to stick to a strict schedule, especially since some signs couldn’t be removed prematurely.

Specialty Lifts for Hard-to-Reach Signs

Many of the signs were located in hard-to-reach places, which required the use of various specialty lifts. These lifts are designed to safely reach high places, making it possible to remove signs from tall buildings and pylon signs.

  • Building Signs: High up on buildings, needing special equipment.
  • Pylon Signs: Tall, freestanding signs requiring precise removal techniques.

The Process of Sign Removal

Removing Electrical Cabinet Signs

One of the most complex parts of the job was removing the electrical cabinet and channel letter signs. These signs not only needed to be taken down but also had to be safely disconnected from their power sources.

  • Safety First: We had to ensure all electrical connections were safely capped to prevent any hazards.
  • Detailed Work: Each electrical cabinet sign was carefully dismantled and removed.

Installing Lexan and ACM Blank Panels

After the signs were removed, we installed Lexan and ACM blank panels as per ADART’s instructions. These panels serve as placeholders, keeping the building’s appearance clean and professional until new signs are installed.

  • Lexan Panels: Durable and clear, these panels are often used for their toughness and visibility.
  • ACM Panels: Aluminum Composite Material panels are lightweight yet strong, making them perfect for temporary coverage.

Overcoming the Schedule Constraints

Dictated Schedule

One of the biggest challenges we faced was adhering to a dictated schedule. Some signs couldn’t be removed too early due to specific requirements set by the bank.

  • Timing: We had to make multiple trips to each location to ensure we followed the schedule precisely.
  • Coordination: Ensuring that each team knew their tasks and timings was crucial to staying on schedule.

The Tools and Equipment We Used

Specialty Lifts

To reach the high and challenging sign locations, we used various types of specialty lifts. These lifts are designed to provide safe and stable access to elevated work areas.

  • Types of Lifts: Boom lifts, scissor lifts, and cherry pickers were among the equipment used.
  • Safety Measures: Each lift was operated by trained professionals to ensure safety.

Installation Tools

For installing the Lexan and ACM panels, we used specialized tools to ensure they were securely fitted and aligned properly.

  • Drills and Fasteners: Essential for attaching the panels to the building surfaces.
  • Measuring Tools: Ensuring precise placement and alignment of each panel.

Reflecting on the Project

Team Effort and Dedication

This project showcased the dedication and teamwork of the SignWorks crew. Despite the complexity and challenges, our team remained focused and committed to completing the job to the highest standards.

  • Communication: Constant communication between crews ensured everyone was on the same page.
  • Problem-Solving: When unexpected issues arose, our team quickly found solutions to keep the project on track.

Client Satisfaction

ADART was very pleased with the results of our work. The careful removal of the signs, the safe capping of electrical sources, and the professional installation of blank panels met all their expectations.

  • Positive Feedback: ADART appreciated our attention to detail and commitment to safety.
  • Successful Partnership: This project strengthened our relationship with ADART, paving the way for future collaborations.

Conclusion

The sign removal project for ADART was a significant undertaking that demonstrated SignWorks’ capability to handle complex and large-scale tasks. From coordinating multiple crews to using specialized equipment and adhering to a strict schedule, our team showed exceptional skill and dedication. The successful completion of this project not only met ADART’s needs but also reinforced our reputation as a reliable and professional sign company. We look forward to future projects and continuing to provide top-notch service to all our clients.